Since the 2014 flood, the City of Burlington has offered a Plumbing Permit Fee Grant Program to provide residents with financial support for improvements done in homes to reduce the risk of basement flooding.
Between 2014 and 2024, the City of Burlington waived $567K in building permit fees.
The program covers the cost of a building permit for:
If multiple items of work are proposed (i.e. backwater valve, sump pump and repair/replacement of a sanitary line) only one building permit application form is required and the location and details of all work can be shown on the same floor plan.
Installation of a backwater valve
In order to apply for a permit to install a backwater valve the following documents must be provided:
- A completed Building permit application form and Homeowner release form
- A copy of the specifications for the backwater valve device to be installed, including backwater valve data sheets, and the make and model.
- A copy of a floor plan or survey indicating the approximate location where the device will be installed.
The permit fee for a backwater valve will not be charged.
Installation of a sump pump
In order to apply for a permit to install a sump pump the following documents must be provided:
- A completed Building permit application form and Homeowner release form
- A copy of the specifications for the sump pump to be installed, including data sheets, and the make and model.
- A copy of a floor plan or survey showing the location of the sump pump and where the water will be discharged on the site. (Engineering Services Department will review the proposed discharge location through a site visit).
The permit fee for a sump pump will not be charged.
Note: A sump pit and sump pump must be installed in the basement to collect water from the weeping tiles and remove/move it outside. A building permit is required for the installation of a sump pump.
Repair/replacement of a sanitary line with the installation of a backwater valve
In order to apply for a permit for repair/replacement of a sanitary line with the installation of a backwater valve, the following documents must be provided:
- A completed Building permit application form and Homeowner release form
- A copy of a floor plan or survey showing the details of the proposed construction specifying pipe material, length and size.
- A copy of BMEC approval or CCMC/Minister’s Rulings for innovative materials.
The permit fee for a repair/replacement of a sanitary line will not be charged.